Etc Sensor+ Touring Rack CEM+ to CEM3 Retrofit Bedienungsanleitung Seite 9

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 20
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 8
2 The Retrofit 7
Step 6: Unscrew and remove the plastic collars from around the termination buttons on
the new control panel circuit board.
Step 7: Slide the new circuit board into the control input panel.
Step 8: Secure the circuit board in place using the 8 screws for the DMX A and B
connectors.
Step 9: Screw the plastic collars in place around the termination buttons.
Step 10: Connect the multi-colored DMX ribbon cable to the new circuit board.
Step 11: Connect the beacon connector red and
black twisted pair(s) to either the first or last
pair of the beacon header (shown here).
SP96 racks will use both pairs.
Step 12: If your rack has a neon indicator to the right of the control inputs, this is a “second
fan indicator”. If yours is not labeled, place the label found in the kit (7143A4001)
above the neon indicator.
Use either pair
DMX Cable
Connection
Beacon Wires
Connection
Seitenansicht 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 19 20

Kommentare zu diesen Handbüchern

Keine Kommentare